Mornington Street Bridge is set to re-open to cars on Sunday 01 November 2026, following works by HS2.
Ongoing HS2 works around Euston – 27 September 2024
Although the final shape of HS2 is in limbo, there are a lot of works still going on around Euston so that the new railway line can come in to Euston Station, and so that Euston Station can be expanded.
Click on the links in the map above to find out more about the different activities.
Euston Area Plan Consultation

Camden Council are updating their draft Euston Area Plan.
The Euston Area Plan is to provide a planning framework for the regeneration of the Euston area that is enabled by the HS2 development at Euston Station.
The updated consultation documents can be found HERE.
There will be an online briefing session on Monday 15 July from 12 pm – 1 pm.
There will be a physical briefing session at the Euston Skills Centre on Starcross Street NW1 2HR on Wednesday 17 July from 4:30 pm – 6 pm.
Email eustonareaplan@camden.gov.uk to reserve a place.
HS2 – Have your say on the Euston Portal Headhouse
A message from HS2:

We invite you to view the final design for the Euston Portal Headhouse following community feedback
The Euston Portal Headhouse will be located along Park Village East, south of Mornington Street Bridge, in Camden. It will sit above a shaft providing ventilation and emergency access to the new high-speed railway tunnel once built.
In February 2024, we held engagement events to gather feedback from the community and local stakeholders on the proposed design for the Headhouse.
Following these events, we have updated our design and incorporated the feedback we received. We now have a final design to share which responds to the character of the local area with the least impact to our neighbours.
To see the design and ask questions about it, please join us at our in-person or online events as below:
In-person event – Tuesday 9 July
- Drop in to the Surma Community Centre (1 Robert Street NW1 3JU) between 12pm to 2pm or 5pm to 7pm to view the final design and talk to the engagement team.
There is no need to register.
Online events
- Wednesday 10 July – 5.30pm to 6.30pm
- Thursday 11 July – 1pm to 2pm
To register, please select the date and time you would like to attend following this link.
If you have any questions about the Euston Portal Headhouse or HS2, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk
Job Opportunities for Apprentice Civil Engineers
HS2 are looking for three (3) Apprentice Civil Engineers.
You will need to be registered with Kings Cross Construction before you can apply.
Applications close on Tuesday 12 December 2023, so if you are interested, you’ll need to be quick!
Thames Water works on Gloucester Avenue September until December
Message from Thames Water:
Overnight Thames Water works – from 11 September to 2 December
Currently Thames Water are carrying out works to install a protective liner in the sewer underneath Gloucester Avenue.
From Monday 11 September to Saturday 2 December, between 8pm and 5am, Thames Water operatives will access the Thames Water sewer at various locations to install a temporary non-structural lining on Gloucester Avenue.
The access will be organised via manholes located on Gloucester Avenue, Oval Road, Prince Albert Road, as well as Walterton Road and Formosa Street, which are in West London (W9). This work will not be noisy.
For further details of above works and copy of notifications to each street, please follow the link here.
Update on out-of-hours work by HS2 around Euston
A message from HS2:
We’re writing to update you on some weekend, extended hours and overnight works taking place in Euston Approaches.
Along with ongoing monitoring of the bridges and structures at track level and site maintenance, we will carry out the following works in end August – September:
- Extended hour works to remove tower crane – 30 to 31 August, 8am to 10pm.
- Overnight work to move silos to Vehicle Holding Area – 12 to 13 September, 5pm to 5am
- Overnight Hampstead Road hoarding maintenance – 23 to 24 September, 7pm to 3am
- Overnight traffic cameras installed to monitor lorries – ongoing, from 21 August, 7pm to 6am
We do not expect above works to be noisy. However residents may notice brief periods of noise during Hampstead Road hoarding maintenance as we clean the road and hoarding, we apologies for inconvenience this may cause.
For further details of above works please follow the link here.
Vacant HS2 flats become arts space
Vacant flats in the Regents park estate, vacant because of HS2 works, are to become affordable creative spaces.
HS2 Drop In Events
In July, HS2 will be holding a series of drop-in events to provide further information on what the pause in HS2 construction means for Camden.
The sessions will take place on:
- Wednesday 5th July 1pm – 4pm at the Old Diorama Arts Centre
- Thursday 6th July 4pm – 7pm at the Surma Centre
- Tuesday 11th July 1pm – 4pm at the Old Diorama Arts Centre
- Thursday 13th July for 4 hours 4pm – 7pm at the Surma Centre
Venue details
- Old Diorama Arts Centre – Regent’s Place, 201 Drummond St, London NW1 3FE, studio 5
- Surma Centre – 1 Robert St, London NW1 3JU.
HS2 construction pause implications
Camden Council is holding two (2) community meetings to discuss the implications of the pause in construction of HS2.
The first meeting on 21 June is a general meeting, and the other meeting on 22 June is a more specialist meeting.
To register, contact the Council at CLT@camden.gov.uk by Friday 16 June 2023.
To help, the Council also have a Commonplace site.
