Thames Water works on Gloucester Avenue September until December

Message from Thames Water:

Overnight Thames Water works – from 11 September to 2 December

Currently Thames Water are carrying out works to install a protective liner in the sewer underneath Gloucester Avenue. 

From Monday 11 September to Saturday 2 December, between 8pm and 5am, Thames Water operatives will access the Thames Water sewer at various locations to install a temporary non-structural lining on Gloucester Avenue. 

The access will be organised via manholes located on Gloucester Avenue, Oval Road, Prince Albert Road, as well as Walterton Road and Formosa Street, which are in West London (W9). This work will not be noisy.

For further details of above works and copy of notifications to each street, please follow the link here.